RIO DELL, HUMBOLDT COUNTY — CALIFORNIA58 LOCAL. Rio Dell has been advancing the Painter Street sewer line replacement and upsizing project to improve reliability between Painter Street and the municipal wastewater treatment plant. The design calls for replacing an older 12-inch segment with an 18-inch pipeline.
What the records show
The city's June 16 council agenda describes a proposed amendment to GHD's engineering contract, increasing the agreement by $229,951 to a revised total of $442,087 and extending design-services completion to July 30, 2027. These are engineering-services figures, not the full construction budget.
The project has been supported by state revolving-fund financing, and the city has also considered a construction contract with Mercer Fraser. Better sewer capacity can help reduce potential overflows and infiltration associated with intense rain.
The publicly discussed engineering timetable does not itself confirm that the entire replacement line is complete or operational. Residents should look for city construction, acceptance and pavement restoration notices for the latest field status.
Public sewer projects require careful coordination to maintain service, access and environmental safeguards while crews work.
Source: Municipal announcement or publicly documented council proceedings. Verify later implementation decisions directly with the City of Rio Dell.
Support Rio Dell News
Choose how to support Rio Dell News:
Credit / Debit Card via StripeChoose your contribution amount on the secure California58 Stripe checkout. One-time support for independent local journalism.
Continue with PayPal Continue with ZelleZelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.
Optional reader support. When possible, add “Rio Dell News” to the payment note. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.More from Rio Dell News
- Guilty plea after fatal Highway 101 head-on crash near Rio Dell killed 19-year-old passenger →
- Rio Dell–Scotia US 101: November 12 Northbound Utility Work and Van Duzen Bridge Repairs →
- Rio Dell Residents Ask for Speed Humps on Riverside Drive; Road Committee to Review Concerns →
- Rio Dell Council Approves Up to $125,000 for City Animal Kennel Project →
- Rio Dell Utility Customers to See New Full-Page Bill Format in Early November →
COMMUNITY
Comments
Join the California58 conversation. You must be signed in to comment.
Create a free California58 account or sign in with an available social provider.